S-Curved Modular Sectional Sofa, Modern Serpentine Fabric Office Lounge Seating, Conversation Sofa for Commercial Lobby and Creative Open Spaces
S-Curved Modular Sectional Sofa, Modern Serpentine Fabric Office Lounge Seating, Conversation Sofa for Commercial Lobby and Creative Open Spaces
Additional Offers
-
Custom Production Time: Dec 04 - Dec 08
Couldn't load pickup availability
Product Details
Product Details
S-Curved Modular Sectional Sofa, Modern Serpentine Fabric Office Lounge Seating, Conversation Sofa for Commercial Lobby and Creative Open Spaces
Dimensions in Inches: Length - 232 IN, Depth - 133 IN, Height - 30 IN Approx. Seating Height:-19 IN Approx.
Material: Internal Structure Marandi Wood Plyboard Frame, Fabric Upholstery & High-Density Foam and Wooden Leg Base With Polish
Feature:
- Modular Versatility: Unique S-shape configuration creates distinct seating zones for collaborative meetings or private waiting areas in open-plan offices.
- Ergonomic Support: High-resilience (HR) foam cushioning paired with a low-profile backrest provides long-lasting comfort for professional environments.
- Architectural Aesthetic: A bold, fluid silhouette that serves as a functional art piece, perfect for lobbies, breakrooms, and high-traffic commercial zones.
Style: Modular Serpentine.
Design & Finish:
- Color combination: Earthy Terracotta / Burnt Orange
- Surface finish: Soft-touch textured matte fabric
- Overall look: Premium contemporary sculptural minimalism
Specs Details:
- Non-fade, anti-dust, high thread count, high rub count
- All structures are built on joinery and via machines, for greater strength
- Mild steel legs with high micron powder coating / Stainless steel 302/304 with PVD polish
- Structure made with fresh and seasoned Pine/Marandi wood
- Seamless stitching via CNC & Japanese machines
- Original Sleepwell/feather foam with high-density
- high stretch count and water-resistant leatherette
- Environment-friendly Furniture
- Five-step quality check
- ISO/ BIFMA Certified
- Material offering excellent resistance to moisture

- Keep Dry - Avoid prolonged exposure to water, moisture, and direct sunlight to maintain the product's finish and durability.
- Clean Gently - Wipe regularly with a soft, dry, or slightly damp cloth. Avoid harsh chemicals, abrasive cleaners, or solvents.
- Use Responsibly - Use the furniture only for its intended purpose and avoid overloading or standing on it to prevent damage.
- Protect the Surface - Use coasters, mats, or pads to protect against scratches, stains, and heat marks.
- Handle with Care - Lift furniture while moving it instead of dragging to avoid structural damage and floor scratches.
- Periodic Maintenance - Tighten screws, bolts, and fittings regularly to ensure long-lasting performance.
- Material Variations - Natural variations in wood grain, color, leather texture, and fabric are normal and are not considered defects.
- Need Help? - For maintenance support or warranty assistance, contact LAKDI Customer Support.
- For detailed Product Care Instructions, please click here:
- 7-Day Return Policy - No returns or exchanges are allowed for change of mind, personal preference, or any other reason. Returns are accepted only if the product is proven to be defective, damaged, or incorrect. Transit damage must be reported at the time of delivery.
- Return Shipping - Customers bear return shipping costs unless the product is defective, damaged, or incorrect, in which case LAKDI arranges free pickup.
- Refunds - Refunds are processed within 7 business days after the returned product is received and approved at our warehouse. Refunds are made through the original payment method.
- Custom & Sale Items - Customized, personalized, clearance, and final sale products cannot be cancelled, returned, or refunded once production begins or the order is confirmed.
- Cancellation Policy - Custom furniture orders cannot be cancelled after production starts. Other products cannot be cancelled once they have been delivered.
- Warranty Coverage - LAKDI offers up to 5 years warranty (depending on product/material). Manufacturing defects are covered, with free repair during the first year and paid repairs (if applicable) thereafter.
- Warranty Exclusions - Normal wear & tear, misuse, scratches, stains, accidental damage, moisture, improper handling, natural wood/leather variations, and unauthorized repairs are not covered.
- Warranty Claim Process - To claim warranty, provide your Order ID/Invoice, product photos/videos, and warranty certificate (if available). Contact support@lakdi.com or call +91-8130301290 for assistance.
- For more information about our Return, Refund, Cancellation & Warranty Policy, please click here.
The moment you confirm your order, we get to work. Your order is created and verified instantly; product, quantity, price and delivery details are all double-checked. This means you start with a clear, confirmed booking with zero confusion.
Every piece of furniture starts as an idea, but we put it on paper first. Our design team creates detailed drawings based on your exact requirements, so the final product looks and fits exactly as planned. This step locks in the dimensions, style and finish before production even begins.
Once initial production is done, we run a thorough quality check. We inspect wood quality, joinery and basic structure against our standards. If anything falls short, the product doesn't move forward until it's fixed. This is the first filter that catches issues early.
Once the product is fully built, it goes through a final inspection. Here we closely check finishing, polish, hardware fitting and overall appearance. We ask ourselves one simple question: "Is this ready to represent us?" The product only moves ahead once the answer is a clear yes.
After quality checks, every item is packed with care to prevent damage in transit. We use sturdy materials, reinforce corners and edges and label each package clearly with order details and handling instructions. Good packaging means your furniture arrives exactly as it left the factory.
Now it's time for your order to reach you. We work with trusted logistics partners experienced in handling large and delicate furniture. You get tracking updates so you always know where your order is and delivery happens at a scheduled time with no surprises, no delays.
Delivery is only half the job; setting it up right matters just as much. Our trained installation team handles the full setup right where it's needed, so you don't have to assemble anything yourself.
Our relationship doesn't end at delivery. If you ever have a question, an issue or need help, our after-sales team is always available. Whether it's a warranty query or maintenance advice, we stay with you until you're completely satisfied with your purchase.
- At Lakdi.com, every piece of furniture is designed around your space, style, and functional needs. We offer complete customization for homes, offices, hospitality, and commercial projects, ensuring every product perfectly matches your vision.
- From executive office tables, reception desks, workstations, conference tables, sofas, beds, wardrobes, dining tables, TV units, storage cabinets, and chairs to complete interior solutions, every product can be customized to your exact requirements.
- Choose from a wide range of sizes, layouts, materials, laminates, veneers, colours, fabrics, foam, finishes, hardware, and accessories. Our design experts work with you to create furniture that combines aesthetics, comfort, and durability while maintaining the highest quality standards.
- Product Size & Dimensions
- Design & Layout
- Material Selection
- Wood Finish, Veneer & Laminate
- Fabric, Upholstery & Foam
- Colours & Surface Finishes
- Storage Configuration
- Hardware & Accessories
- Legs, Base & Frame Design
Furniture Available for Customization
- Executive Office Tables
- Reception Desks
- Office Workstations
- Conference Tables
- Office Chairs
- Sofas & Sofa Sets
- Beds & Headboards
- Dining Tables & Chairs
- Wardrobes
- TV Units
- Storage Cabinets
- Coffee Tables & Side Tables
Residential & Commercial Interiors
Your Design. Your Materials. Your Furniture.
Every Lakdi.com product is custom-crafted to fit your space, style, and lifestyle—delivering furniture that's truly made for you.
1. Orders & Purchases
2. Returns & Exchanges
3. Shipping & Tracking
4. Product Information & Site Measurement
5. Payments, Pricing & Discounts
6. Warranty & After-Sales Support
Explore the Finer Points
Customize Your Way
Furniture should feel like yours, not something picked off a shelf. That's why we offer a wide range of customization options colors, finishes, fabrics and materials across our entire collection. Whatever you choose, you decide how it looks and feels.
Conscious Crafting
Good furniture shouldn't cost the planet. Every piece we make goes through responsible sourcing, sustainable production and eco-focused design from raw material to final finish. This isn't limited to one category. It's how we build everything we sell.
Building a Greener Future
Sustainability isn't an afterthought at Lakdi.com it's part of how every piece is planned. We use eco-friendly materials and manufacturing practices across our full collection, so every purchase you make is a greener choice.
Certified for Sustainability
Every product we sell meets strict eco-certification standards. This means you can shop with confidence across our entire range, knowing that quality and environmental responsibility go hand in hand, no matter what you pick.
See your space in a new light
Recently viewed products
Picked up right where you left off – your recently viewed favorites are here.
Best Selling Products
Don’t miss out! Explore our best-selling pieces that everyone is adding to their homes and offices right now.

